[September 30, 2017]

Finally, the best part of all… planted grass seed and turned on irrigation!  Flagstone patio and walkways to be arranged and set by Oct. 1st. Weather perfect.

April 11, 2017
My favorite part! After a lot of head scratching, we determined that significant terracing of the hillside was the solution to enhancing the western views and encouraging outdoor use of the (future) flagstone patio and built-in BBQ. With a lot of chainsawing, digging and sculpting of the earth, we installed sixty 16′ railroad ties (from Westchester) to create a series of large window boxes for the dozens of Ilex Holly shrubs and Arborvitae trees.